In November 2025 Eversource was still at work at the Surf Drive Beach Parking Lot.  On 04/03/26 Lawrence-Lynch Corp was paving the parking lot.  On 04/27/26 I took a picture of the finished cross walk that was ‘reinstalled’ going from the corner of Walker Street to the right of the Ellen T Mitchell Bath House and the Surf Drive Beach Parking lot that had been paved and restriped.  Members of the OSDA Board and Committee members petitioned the DPW in 2025 with a written report followed up with an office visit to get this reinstalled and we are pleased that they reconsidered and put the cross walk back.